Repainting – the whole story

Well we planned to have Lady’s Smock repainted over the winter 2019-2020 but as we all know fate was not kind to the world, so it took a little longer than expected. Mary and Laurie moved the boat to Bourne boats at Park Gate Teddesley in November 2019, with painting scheduled for April 2020. Here is what she looked like then.
As it eventually turned out, she was out of the water and ready to go into the workshop in early July.

 
Failed to get data. Error:
Request had insufficient authentication scopes.

By the 8th of August the old paintwork had been blasted off and the first new coats applied, looking good. We had chosen to have two pack applied as it should be harder wearing in the long term.

 
Failed to get data. Error:
Request had insufficient authentication scopes.

We understand the windows were a nightmare, well done to Dan, Wayne and their team for doing a thorough job and removing the windows and doors to ensure any old rust could be found and removed.

 
Failed to get data. Error:
Request had insufficient authentication scopes.

This was not achieved without a fair amount of dust and grit, which was however cleaned up eventually.

The work was neatly done and the new solar panels look good. Dan managed to hide the wiring well and with solar panels near the front we can clear the clutter from the view ahead to make cruising easier.

 
Failed to get data. Error:
Request had insufficient authentication scopes.

It’s the details that matter, the new coach lines and bow flash designs are an improvement on the rather tired paintwork we had. As far as we know the boat had probably not been repainted much in her 18 years. Also take a closer look at the new Lady’s Smock artwork here.

 
Failed to get data. Error:
Request had insufficient authentication scopes.

Getting all the work finished did take little while but as has been commented before if we want to get things done at more than four miles an hour, why did we buy a boat in the first place?

We finally got on board on the 21st of October and bid Teddesley farewell. We managed get our trip back to Fazeley in just in time to avoid the second Covid-19 lockdown of the year, and before a planned canal stoppage on the 2nd November!

So we were back just in time to shut her down for the winter!

Our trip to Fazeley is documented here (with some more nice shots of the shiny new paintwork).

The new artwork – Lady’s smock

With a big thank you to Andy Russel and one of Howard and Jean’s friends, here is a quick look a the steps in the transformation from the tired old cabin side artwork to a brand new logo.

Updated Feb 2021 with new cushion artwork by our next ‘boat’ neighbours in the marina.

 
Failed to get data. Error:
Request had insufficient authentication scopes.

High and dry

Dry dock

 
Failed to get data. Error:
Request had insufficient authentication scopes.

Lady’s Smock has been protected from the elements in a poly-tunnel and grit blasted in preparation for application of two-pack epoxy to the hull. This coating will protect the steel hull from the corrosive effects of canal water for a number of years and should last longer than the 2-3 years that can be achieved using currently available blacking products.

Looks like we’re almost there

Looking forward to seeing Lady’s Smock tomorrow. Hopefully all the work being done to the inside has been completed. New bunks amidships, new bed at the front and two new wardrobes. New drawers and a new table. Updated battery management and monitoring. New DAB radio and lots of new DIN 12v and USB sockets.